Monday, October 27, 2014
Fairway Drainage
Last week we installed 2200 feet of drainage tile on 18 fairway. The tile is anywhere from 18 to 30 inches deep depending on undulations and slope of the fairway. The tile is then covered with clean rock and 4 inches of sand at the top of the trench. Our crew did all of the sod removal and prep work, as well as the finish/clean up work. The Cutting Edge did all of the important stuff with the trenching and rock backfill. We had a really good system down and the outcome is exactly how I wanted it, very good work!!